The following safety measures are taken during civil engineering construction. (i) Suitable scaffolds should be provided for workmen. (ii) When ladder are used, it should be provided with foot holds and hand holds and inclination of one is to four (1 horizontal : 4 vertical) be provided. (iii) The scaffolding should be properly supported and shall have a guard rail property attached to it. (iv) Every opening in floor of a building should be provided with suitable means to prevent the fall of persons or materials. (v) Fencing and lights shall be provided to protect the public from accident. (vi) The excavated material shall not be placed within 1.5m of the edge of the trench or half the depth whichever is more to avoid collapse of sides due to surcharge. (vii) No undermining or undercutting shall be allowed. (viii) All roads and open areas adjacent to any side where demolition is to be carried out, must be closed or suitably protected. (ix) No electrical cable etc. shall remain electric...
Question: How would you undertake the re-organisation of an Enterprise? (Summer 2005)
Re-organisation is hot corrective action. It revises routes, loads and schedules of an enterprise. In manufacturing unit this is often required as per changes in market conditions, manufacturing methods, or any other factors affecting the plant will often indicate that a new manufacturing plan is needed.
In advance, the route of work through the plant, determines the amount of productive capacity required to do the work, and based on the availability of this capacity schedules all phases of the work so that the plant will be effectively utilized.
Comments
Post a Comment
Kindly let me know, if you want to know anything.