The following safety measures are taken during civil engineering construction. (i) Suitable scaffolds should be provided for workmen. (ii) When ladder are used, it should be provided with foot holds and hand holds and inclination of one is to four (1 horizontal : 4 vertical) be provided. (iii) The scaffolding should be properly supported and shall have a guard rail property attached to it. (iv) Every opening in floor of a building should be provided with suitable means to prevent the fall of persons or materials. (v) Fencing and lights shall be provided to protect the public from accident. (vi) The excavated material shall not be placed within 1.5m of the edge of the trench or half the depth whichever is more to avoid collapse of sides due to surcharge. (vii) No undermining or undercutting shall be allowed. (viii) All roads and open areas adjacent to any side where demolition is to be carried out, must be closed or suitably protected. (ix) No electrical cable etc. shall remain electric...

Scope of Project Control

Question : What are the important aspects to be considered for a project within the scope of project control? (Summer 2005)


The main objective of project management can be described in terms of a successful project which has been finished on time, within the budgeted cost and to technical specifications which are required by the end users. A project is any human undertaking with a clear beginning as well as clear ending. Planning, scheduling, and controlling the work during any worth-while project is the main task for any project manager.  

Control requires not only current status information but insights into possible trade-offs when difficulties arise. Normally for any project, one may be interested in answering the questions such as: 

(i) When do we expect the project to be completed.

(ii)  If any activity is delayed, what effect will this leave on overall completion time of the project.

(iii) If there are additional funds available to reduce the time to perform certain activities, how should they be spent, and

(iv) What is the probability of completing the project by scheduled data.


Comments

Popular posts from this blog

HOW TO DEVELOP A NEW PRODUCT.

STEPS TO SUCCESSFULLY DEVELOP A NEW PRODUCT: Various phases for successfully developing the product are: 1. PLANNING: It is also known as zero phase since it precedes the project approval and launch of the actual product development process. this phase begins with corporate strategy and includes assessment of technological developments and market objectives. the output of this phase is project mission statement, which specifies the target market for the product, business goals, key assumptions and constraints.  2. CONCEPT DEVELOPMENT: In this phase of concept, the needs of market are identified, alternative product concept are generated and evaluated and a single concept is selected for further development.  3. SYSTEM-LEVEL DESIGN: The system-level design phase includes the definition of the product architecture and the division of the product into sub-systems and components. The final assembly scheme for the production system is usually defined during this phase as well. The ...

Four C's Model for Evaluate an Organization's Human Resource Management Program

Explain how the four C's Model can be used to evaluate an organization's human resource management program?   Four C's of Human resource management program given by Harvard Business School: 1. COMMITMENT: Every worker should be committed to his work sincerely in order to give best performance.  2. CONGRUANCE: The worker must work in harmony with his colleagues and management both achieve his targets. 3. COMPETENCE: For professional employees to develop competencies and inter-personal skills. Such as coaching, group process and problem solving are the important tasks for HRD programs. Competency in performing the job as needed to grow organizations in a global environment.   4. COST EFFECTIVENESS: The salary or any other benefits provided to employee by management depends upon his cost effectiveness to the otganisations. So employee must look for his cost effectiveness in an organisation.

SWOT analysis and its importance in setting of objectives and planning of strategies in an organisation.

 SWOT Analysis: S stands for strength, W stands for weakness, O for opportunities, T stands for threats. It has been common to suggest that companies identify their strengths and weaknesses, as well as the opportunities and threats in the external environment. The SWOT analysis are based on the analysis of the external environment (threat and opportunities) and the internal environment (weakness and strengths). (i) The WT strategy aims to minimize both weakness or threats and may be called the minimum strategy. It may require that the company, for example, from a joint venture, retrench or even liquidate. (ii) The WO strategy attempts to minimise the weakness and maximize the opportunities. Thus, a firm with certain weakness, in some areas may either develop those areas within the enterprise or acquire the needed competencies from the outside, making it possible to take advantages of opportunities in the external environment. (iii) The ST strategy is based on the organisation's str...