The general safety measures taken during civil engineering construction.

The following safety measures are taken during civil engineering construction. (i) Suitable scaffolds should be provided for workmen. (ii) When ladder are used, it should be provided with foot holds and hand holds and inclination of one is to four (1 horizontal : 4 vertical) be provided. (iii) The scaffolding should be properly supported and shall have a guard rail property attached to it. (iv) Every opening in floor of a building should be provided with suitable means to prevent the fall of persons or materials. (v) Fencing and lights shall be provided to protect the public from accident. (vi) The excavated material shall not be placed within 1.5m of the edge of the trench or half the depth whichever is more to avoid collapse of sides due to surcharge. (vii) No undermining or undercutting shall be allowed. (viii) All roads and open areas adjacent to any side where demolition is to be carried out, must be closed or suitably protected. (ix) No electrical cable etc. shall remain electric

The Sequence of Activities for Exercising Managerial Control in Organization.

 


The control process in all the situations have following activities : 

(a) Establishment of Standards : A standard is a criterion against which results can be measured. These standards refer to goal, plan, objectives, targets etc.

(b) Measurement of Performance : This step in the control process includes the setting up of methods of observation inspection and reporting. Reports at regular intervals, audits, test checks etc. are generally done to control the performance at various levels in the organization.

(c) Comparing the Activity : Results obtained are then compared with the standards. Returns received at regular intervals, audit etc. provide feedback for performance which is then compared to find out if there is any deviation. Negative deviation means a loss and needs remedial action, whereas positive deviation means a gain and does not warrant any control function, and as such the feedback information are ignored.

(d) Remedial Action : In the last activity of process of control manager initiates action for correction of deviation from standards. For such action, a review is promptly done to make control function more effective. In good organizations, a system is made for automatic and self regulating control process.

Comments

Popular posts from this blog

HOW TO DEVELOP A NEW PRODUCT.

STEPS TO SUCCESSFULLY DEVELOP A NEW PRODUCT: Various phases for successfully developing the product are: 1. PLANNING: It is also known as zero phase since it precedes the project approval and launch of the actual product development process. this phase begins with corporate strategy and includes assessment of technological developments and market objectives. the output of this phase is project mission statement, which specifies the target market for the product, business goals, key assumptions and constraints.  2. CONCEPT DEVELOPMENT: In this phase of concept, the needs of market are identified, alternative product concept are generated and evaluated and a single concept is selected for further development.  3. SYSTEM-LEVEL DESIGN: The system-level design phase includes the definition of the product architecture and the division of the product into sub-systems and components. The final assembly scheme for the production system is usually defined during this phase as well. The output of

Four C's Model for Evaluate an Organization's Human Resource Management Program

Explain how the four C's Model can be used to evaluate an organization's human resource management program?   Four C's of Human resource management program given by Harvard Business School: 1. COMMITMENT: Every worker should be committed to his work sincerely in order to give best performance.  2. CONGRUANCE: The worker must work in harmony with his colleagues and management both achieve his targets. 3. COMPETENCE: For professional employees to develop competencies and inter-personal skills. Such as coaching, group process and problem solving are the important tasks for HRD programs. Competency in performing the job as needed to grow organizations in a global environment.   4. COST EFFECTIVENESS: The salary or any other benefits provided to employee by management depends upon his cost effectiveness to the otganisations. So employee must look for his cost effectiveness in an organisation.

SWOT analysis and its importance in setting of objectives and planning of strategies in an organisation.

 SWOT Analysis: S stands for strength, W stands for weakness, O for opportunities, T stands for threats. It has been common to suggest that companies identify their strengths and weaknesses, as well as the opportunities and threats in the external environment. The SWOT analysis are based on the analysis of the external environment (threat and opportunities) and the internal environment (weakness and strengths). (i) The WT strategy aims to minimize both weakness or threats and may be called the minimum strategy. It may require that the company, for example, from a joint venture, retrench or even liquidate. (ii) The WO strategy attempts to minimise the weakness and maximize the opportunities. Thus, a firm with certain weakness, in some areas may either develop those areas within the enterprise or acquire the needed competencies from the outside, making it possible to take advantages of opportunities in the external environment. (iii) The ST strategy is based on the organisation's str