The following safety measures are taken during civil engineering construction. (i) Suitable scaffolds should be provided for workmen. (ii) When ladder are used, it should be provided with foot holds and hand holds and inclination of one is to four (1 horizontal : 4 vertical) be provided. (iii) The scaffolding should be properly supported and shall have a guard rail property attached to it. (iv) Every opening in floor of a building should be provided with suitable means to prevent the fall of persons or materials. (v) Fencing and lights shall be provided to protect the public from accident. (vi) The excavated material shall not be placed within 1.5m of the edge of the trench or half the depth whichever is more to avoid collapse of sides due to surcharge. (vii) No undermining or undercutting shall be allowed. (viii) All roads and open areas adjacent to any side where demolition is to be carried out, must be closed or suitably protected. (ix) No electrical cable etc. shall remain electric...

Preventive Maintenance

 What is Preventive Maintenance?

.

Organized maintenance work carried out to prevent breakdown by well conceived plans of inspection, lubrication, adjustments and overhaul refer to preventive maintenance. It can be time based or condition base. Preventive maintenance is a routine inspection of production systems and this service activity is designed to detect potential failure conditions so as to make minor adjustments and/or repairs that will help to prevent major operating problems. Production systems like chemical plants, refineries, steelmills or any flow shop operate continuously and cannot afford the break-down of a machine operative in the system. Since such a failure will bring the entire plant to a stand still and the losses incurred during the downtime are enormous. In such cases the preventive maintenance is most attractive and effective policy. The critical machines belonging to the production system are detected and are maintained under the preventive maintenance schedule designed.   



Comments

Popular posts from this blog

The construction of Cantilever RCC slab from starting up to commissioning.

Construction of Cantilever RCC Slab: The following steps would be involved: (i) Form Work: Staging should be designed and erected. The staging shall be of tubular steel structure with adequate bracing as approved or made of built up structural section made from rolled structural steel sections. Shuttering used shall be of sufficient stiffness to avoid excessive deflection and joints should be tightly butted to avoid leakage of slurry. If required rubberised lining of material shall be provided in the joints. Steel used for concreting should be suitably stiffened. It should be properly repaired before use and it should be ensured that it is properly cleaned to avoid stains, honey combing, seepage of slurry etc. The holes, if any must be plugged.  Suitable camber shall be provided to counteract the effect of deflection. The camber at free ends shall be 1/50th of the projected length.  The shuttering must be coated with mould oil. (ii) Placing of Reinforcement: The reinforcemen...

The general safety measures taken during civil engineering construction.

The following safety measures are taken during civil engineering construction. (i) Suitable scaffolds should be provided for workmen. (ii) When ladder are used, it should be provided with foot holds and hand holds and inclination of one is to four (1 horizontal : 4 vertical) be provided. (iii) The scaffolding should be properly supported and shall have a guard rail property attached to it. (iv) Every opening in floor of a building should be provided with suitable means to prevent the fall of persons or materials. (v) Fencing and lights shall be provided to protect the public from accident. (vi) The excavated material shall not be placed within 1.5m of the edge of the trench or half the depth whichever is more to avoid collapse of sides due to surcharge. (vii) No undermining or undercutting shall be allowed. (viii) All roads and open areas adjacent to any side where demolition is to be carried out, must be closed or suitably protected. (ix) No electrical cable etc. shall remain electric...

Four C's Model for Evaluate an Organization's Human Resource Management Program

Explain how the four C's Model can be used to evaluate an organization's human resource management program?   Four C's of Human resource management program given by Harvard Business School: 1. COMMITMENT: Every worker should be committed to his work sincerely in order to give best performance.  2. CONGRUANCE: The worker must work in harmony with his colleagues and management both achieve his targets. 3. COMPETENCE: For professional employees to develop competencies and inter-personal skills. Such as coaching, group process and problem solving are the important tasks for HRD programs. Competency in performing the job as needed to grow organizations in a global environment.   4. COST EFFECTIVENESS: The salary or any other benefits provided to employee by management depends upon his cost effectiveness to the otganisations. So employee must look for his cost effectiveness in an organisation.